You are not currently logged in. Log In | Register

Building Industry News

Saniflo overcomes drainage obstacles with pumped solution

08/04/2009 17:20:05

 

Saniflo overcomes drainage obstacles with pumped solutionSaniflo has successfully installed new water facilities at Middlesbrough Football Club, despite a tricky brief that required a pumped solution for the male WCs.

Contractor Vickers constructed two purpose-built units containing male and female toilet and washroom facilities, but soon realised that the distance from the existing drainage point would cause problems with waste flow in the male units.

After consulting their local Saniflo area sales manager, Vickers decided to install a high-performance macerator pump that is capable of discharging water from multiple WC facilities and other waste-producing sites.

The company settled on the Sanicubic unit, which pumps waste away through small-bore 50mm pipework up to 11m vertically or 100m horizontally.

"Sanicubic proved well within its capabilities to overcome the situation at Middlesbrough and provided a satisfactory solution to the problem," Saniflo commented.

Saniflo last month reached an important milestone in the company's history when the Yorkshire Air Ambulance Service took delivery of the company's millionth unit produced. ADNFCR-1903-ID-19115004-ADNFCR

 

Related Stories:

 

Demand for high-quality bathrooms rising

21/07/2011 09:32:57

 

App offers bathroom makeover tips

04/07/2011 10:21:26

 

UK urged to ditch baths for showers

15/06/2011 10:26:56

 

New kitchen and bathroom worktop range unveiled

06/04/2011 08:58:18

 

Britons 'aware of climate change'

01/04/2011 09:34:49